- Artsy (2)
- Bamboo (2)
- Bathroom (1)
- Closet room (3)
- Dining Room (2)
- Food (1)
- Kitchen (15)
- Living Room (1)
- Maine (1)
- Martha's Vineyard (1)
- Moxie (8)
- Outside (4)
- Painting (1)
- Porch (4)
- Travel (2)
- Uncategorized (2)
- Woodworkring (1)
- Yard (9)
- 16. May 2010: Backyard Update
- 1. May 2010: Kitchen Backsplash
- 15. August 2009: Hiking/Camping Mt. Monadnock
- 15. August 2009: Butterfly
- 15. August 2009: A place to sit!
- 15. August 2009: Patio done!
- 25. July 2009: All ready for the patio!
- 20. July 2009: Rhizome barrier
- 19. July 2009: Backyard is starting to shape up!
- 11. July 2009: Some new hanging baskets
Ceiling is up!!
Today we finished putting up the sheetrock for the ceiling! We used 5/8″ drywall for the ceiling. As you can see from some of the pictures with Katie, I made a “T” brace to hold up one end of the sheetrock while I screwed it into the ceiling joists. Once up, I used my dremel with a drywall attachment to make the circular cutouts for the preinstalled recessed lights
I almost have all of the OSB plywood down over the wood plank subfloor. A product called “Ditra” which is a 1/8″ thick roll of flexible plastic will be applied to the plywood and then the tile over the Ditra.
Within the last week I was able to get new insulation stapled into the exterior walls. Here is a picture link that describes what is going on with the long exterior wall of the kitchen before we put up the sheetrock (1/2″ thick) on the walls. Hopefully the walls can get done this week.
070608_0375_1.jpg