- Artsy (2)
- Bamboo (2)
- Bathroom (1)
- Closet room (3)
- Dining Room (2)
- Food (1)
- Kitchen (15)
- Living Room (1)
- Maine (1)
- Martha's Vineyard (1)
- Moxie (8)
- Outside (4)
- Painting (1)
- Porch (4)
- Travel (2)
- Uncategorized (2)
- Woodworkring (1)
- Yard (9)
- 16. May 2010: Backyard Update
- 1. May 2010: Kitchen Backsplash
- 15. August 2009: Hiking/Camping Mt. Monadnock
- 15. August 2009: Butterfly
- 15. August 2009: A place to sit!
- 15. August 2009: Patio done!
- 25. July 2009: All ready for the patio!
- 20. July 2009: Rhizome barrier
- 19. July 2009: Backyard is starting to shape up!
- 11. July 2009: Some new hanging baskets
Walk-in closet Part 2
I finished one side of the walk in closet today! There is one shelf for each side down in the basement, but I don’t think we will need them. I got a really good deal on the birch cabinet grade plywood at Home Depot. I used birch veneer banding and a light walnut oil stain from Varathane. After that was the water based urethane from Minwax in a gloss finish.
I used no glue instead opting for pocket hole joinery. Basically, you drill a hole with a special jig set to a certain depth in the angled template(the blue thing) that is clamped down down to the wood. You can then screw two pieces of wood together and hide the screws. You are making a pocket for the screw to slip into. Here I am drilling some holes.
![]()
Allright time for, as HGTV would call it,”THE GRAND REVEAL!”
up the stairs…
![]()
even a special spot designed for Moxie’s litter pod!
![]()
hmmmm now what about that other side ![]()
![]()
Allright I have to start making Giada’s lasagna now. ![]()