The porch!

The next project we decided to work on was the side porch.  There was a lot of potential there but nothing was ever done to the space to make it really nice to be in.  There was some stained rubber backed carpet tiles and thats about it.  We decided to put a prefinished hardwood in, paint the walls, and make some curtains for all the windows.  There are windows going all the way around.  First was to reinforce the subloor planks with some 5/32″ plywood.
0414_2.jpg 0414_3.jpg

Then, we started looking at fabrics for the curtains, but none of these really caught our eye, except for Moxie’s?  Guess I’ll have to make another post of the fabric we ended up getting. :)  The non-winning ones, we got samples of from denverfabrics.com.
0414.jpg 0414_1.jpg

Under the windows we thought beadboard would look great especially with the age of the house.  I knew I would need a pneumatic finish nailer for some of the hardwood flooring so this was the perfect time to pick up a 16 gauge nailer to use with the beadboard paneling as well.  The nailer was awesome!  I used it for fastening the paneling and the chair rail that meets up against the window sill.  The nail holes were tiny and just a little joint compound and a quick sand over each one concealed the hole.  After some caulking in of a few open cracks, everything got primed.
0414_31.jpg 0414_21.jpg
04141.jpg 0414_11.jpg

Now, it really started transforming once the priming was done, we picked colors and applied it. The colors really play into the the colors in the fabric for the curtains.
0414_22.jpg 0414_12.jpg 04142.jpg

Now it was time to install the flooring.  We went with a 3/4″ solid hardwood wide plank from Lumber Liquidators.  Its the Knob Hill Birch, handscraped and in a dark stain.  We bought it about two weeks ago and it was sitting in our dining room getting acclimated to the humidity in our house.  Before installing a 15 lb roofing asphalt paper was layed down and stapled.  Then I put a chalk line on the floor against one wall to get a nice straght line for the first row of flooring.  After that I was able to put the rest of the flooring in today with an air floor nailer that I rented.  We really like how it turned out.  Next step is to fill in any nail holes, paint the heater covers, and install the mouldings around the outside.
0414_13.jpg 04143.jpg 0414_23.jpg
0414_32.jpg 0414_4.jpg

I wonder what Moxie thinks of her new space?
0414_5.jpg

Time to teach Moxie that she has to clean up for herself in the new porch. ;)
0414_6.jpg 0414_7.jpg 0414_8.jpg

Leave a Reply