- Artsy (2)
- Bamboo (2)
- Bathroom (1)
- Closet room (3)
- Dining Room (2)
- Food (1)
- Kitchen (15)
- Living Room (1)
- Maine (1)
- Martha's Vineyard (1)
- Moxie (8)
- Outside (4)
- Painting (1)
- Porch (4)
- Travel (2)
- Uncategorized (2)
- Woodworkring (1)
- Yard (9)
- 16. May 2010: Backyard Update
- 1. May 2010: Kitchen Backsplash
- 15. August 2009: Hiking/Camping Mt. Monadnock
- 15. August 2009: Butterfly
- 15. August 2009: A place to sit!
- 15. August 2009: Patio done!
- 25. July 2009: All ready for the patio!
- 20. July 2009: Rhizome barrier
- 19. July 2009: Backyard is starting to shape up!
- 11. July 2009: Some new hanging baskets
Patio done!
Well Katie and I finished the patio a week or two ago and it came out great! All that backbreaking labor paid off I guess. :) After excavating the site down about 8″ we started filling the area with 3/4 crusher run which is a compacting gravel with no pieces larger than 3/4″. We had to put down two layers of about 2-3″ each because the compacting machine can only compact that much at one time. So here we are filling the site and keeping everything graded at the same time. These pics are all before the compactor was run over it.
![]()
![]()
Here I am compacting the 2nd and final layer of the gravel base.
![]()
Now we layed down an inch of sand and put the pavers on top. I layed down 7/8″ electrical conduit on the base and screed sand between them with a flat piece of wood. Katie would bring the pavers up from the driveway and I would screed the sand and lay the pavers down. We had a specific design from the TechoBloc the manufacturer so we knew how many rectangle and square pieces to order. We installed a “soldier” border around the outside of the same style but different color pavers to really set it off. We were both starting to really get tired at this point lol.
![]()
![]()
Some finished pics! After getting all the pavers down I had to make some cuts to fill in spaces where whole blocks wouldn’t fit. This was not fun at all. I used a wet tile saw and got just covered in the spray. A snap edge plastic edging was placed around the entire patio to hold the pavers and to keep the sand from washing out. These are held in place by 10″ galvanized spikes every 18″ or so. Alas, all the cuts were made and a polymeric sand got swept across the patio to fill in the spaces between the pavers. Then I had to compact the pavers twice with the compactor, sweeping the special sand over the whole thing between compactions. After the 2nd compaction, I made sure there was no sand on the surface and then wet everything down with a mist to activate the polymers that are mixed in with the sand. Success!
The snap edge andthe soldier border.
![]()
Special spot for the grill.
![]()